News from VPENew Equipment!Vacuum Process Engineering is pleased to announce the installment of the first of two Vertical Retort Furnaces. These furnaces are being installed to fulfill a contract to braze aluminum parts for Homeland Security equipment. Our second furnace is scheduled to be completed by the end of this year. These vertical retort furnaces are designed to braze aluminum to ceramic, aluminum to aluminum as well as aluminum to other metals. » Read More |
Pinch Off Tubes
High vacuum brazed pinch-off tubulations sealed in low outgassing bags prior to packaging and shipment.Pinch-off and Pump-out Tubes and Tube Assemblies for Critical Applications High integrity pinch-off and pump-out tubes have been provided for use in mission-critical applications for more than a decade. Thousands of tubes and tube assemblies have been shipped to laser and lithography equipment manufacturers, defense contractors, government agencies, and other defense and research organizations. Tubes are processed according to well-developed procedures to assure the highest quality product is provided. Our processing assures that correct tubing wall grain sizes and interior wall cleanliness are attained for is assured. For brazed assemblies, we only use low vapor pressure and the highest grade filler metals to assure a clean and reliable seal is made every time. Standard sizes pinch-off tubes and pump-out assemblies can be delivered within 10 working days (ARO) for quantities of 100 units, see below:
1. All dimensions are in inches. a. Outside diameter: +/- 0.002"
3. Material is seamless OFE Copper (UNS C10100) per ASTM F68.B75 To specify a tube or tube assembly part number please make the following selections:
1. Tube diameter: Nominal diameter in 1/16" increments (size "2" is 1/8 inch nominal diameter)
1. Tube length to the accuracy desired.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||